Brandonivalves Thermal power station progress of work

Thermal power station progress of work

Thermal power station progress of work and development and distribution of an hotel structure plant. 

Used valves:

  • B1.000
  • Eco3F
  • 20.900
  • F15.000
  • J9.100
  • J9.128
  • W6.020
  • L9.100
  • L9.128
  • B2.100
IMG_5216.jpg IMG_5188.jpg